Highway 14: Stage D
Stage D of the Highway 14 corridor upgrade is being constructed from
Waseca to Owatonna, Minnesota. C.S. McCrossan is building the 14 mile
stage with help from Mathiowetz Construction and F&K Trucking and
Excavating. Stage D of the project includes grading, paving 14 miles of
4 lane freeway, the building multiple new bridges and constructing a new
interchange at Interstate 35W at a cost of $52 million. The 4 stage
project is scheduled to be completed in 2012.
Equipment
Bobcat: S220 with grapple bucket grapple.
Caterpillar: 525B, 345Dl, D5K, D7H, D8R, D9G push dozer, D9H, D9H
   push dozer, 65D with towed disk, 627B, 627F, 627G, 637D.
Ecolo-Tiger: 530B.
Wishek: Y2000.
Steiger: PT225 Panther with towed compactor, PT350 Panther with
   towed disk.
Timbco: T445.
August 2011