The Highway 212 project begins in Eden Prairie, Minnesota and ends in
Carver, Minnesota. It was a design/build project done by Zumbro River
Constructors (ZRC), a joint venture of Ames Construction and Edward
Kramer & Sons. The scope project included 10 million cubic yards of
excavation, 12 miles of new four lane freeway and 28 bridges at a cost of
$238 million. The highway was completed in July of 2008.
Equipment
American Hoist: 5299.
Bobcat: S220.
Caterpillar: 140G, 140Mawd, 143H, 14G, 14H, 14M Prototype, 14M,
   320Cl, 330Bl, 330Dl, 345Bl, 345Cl, 375l, 385Cl, MT865B with Eject 22,
   613C, 623F, 627F, 627G, 631E, 631E water tanker, 631G, 740,
   CP563C, CP563D, CP563E, 815B, 815F, 966G, 966H, D4Clgp, D5Hxl,
   D6Nlgp, D6Rlgp, D6Rxw, D7H, D8N, D8R, D8T, D9T, D10N, D10N
   push dozer, PR105.
CMI Corporation: TR225B, Highway Trimmer.
John Deere: 644J, 850Jlgp, 7420, 8560 with Wishek disk and proof
   roller.
Dynapac: CA262 Padded and Smooth Drum.
FMC | Link-Belt: LS338.
Foremost: DR24.
Gomaco: GT6300 Commander 3.
Guntert and Zimmerman: PS1200, S850 Quadra.
Rayco: T275 Hydra-Stumper.
Terex | American: HC80.
Vermeer: P185.