Interstate 15
North Corridor Constructors, LLC, a joint-venture between Las Vegas
Paving Corporation and engineering firm CH2M Hill was contracted by the
Nevada Department of Transportation (NDoT) to improve the Interstate
15 corridor from the I15/US95 "Spaghetti Bowl" interchanges to Craig
Road in North Las Vegas. When completed, this $242 million design/build
project will relieve the congestion and improve traffic flow throughout the
corridor as the Las Vegas valley grows. The project is scheduled to be
completed in 2010.
Equipment
Caterpillar: 446D with impact hammer, 325B with foundation drill,
   330B with foundation drill, 245 with impact hammer, 621G with Mega
   8000 water tanker.
Dynapac: CC722.
Hitachi: EX400lc, Zaxis 330lc with impact hammer, Zaxis 450lc, EX750
   with shear.
Kawasaki: 70ZV, 85ZV, 115ZV.
Kobelco: 325SR.
Liebherr: R954C.
Link-Belt: RTC8030.
Link-Belt|LBX: 460lx with impact hammer.
September 2008