Minnesota Limited was contracted to construct a 6.06 mile upgrade to
the natural gas pipeline in Lake Elmo, Minnesota as a part of the Northern
Lights project, a multiphase $120.5 pipeline expansion project for
Northern Natural Gas. The new 30 inch pipe was placed parallel to the
existing 24 inch pipe that runs north and south through the city.
Equipment
Caterpillar: 14H, D6Mlgp, D6Rlgp, D7H, D7Rxr, D8R, 571G, 583T,
   330Dl.
Caterpillar|Midwestern Manufacturing: M583K.
John Deere: 450Dlc, 9320T with a DMI 530B.