Wapsipinicon Wind Project: North
The Wapsipinicon Wind Project (North) is being constructed by
Mortenson Construction in Dexter, Minnesota. The project consists of 67
1.5 MW wind turbines covering an area of 40 square miles. The towers
will be 262.5 feet in height. The rotor diameter will be 252.6 feet, making
the maximum overall height 388.8 feet when one blade is in the vertical
position. The electrical collector system will consist of underground 34.5
kV collection lines and facilities providing step-up transformation. There will
also be a 161/34.5 kV substation which will have 2 161/34.5 transformers
with the associated switching/protection equipment and metering
equipment in a small control house.
Viet Companies recieved the site preperation contract with MP Nexlevel
contracted to complete the utiliy work.
A small interesting fact about Mortenson Construction: As of 2007 they
have installed 34 percent of all the active wind power in the United States.
Equipment
Aspen Custom Trailers: 3 axel front schnable tower transporter, 5
   axel schnable tower transporter.
Caterpillar: 308Ccr, 330Cl, 345Cl, CS563E, D4Hlgp, D6Rlgp, 140G,
   14M, 247B2, 950G, TH580, TH580B, TL1055.
Grove: GMK5240, RT875E, RT890E.
JLG|Lift: 660SJC.
John Deere: 750Jlgp.
Kobelco: SK170.
Manitowoc: 222, 12000, 2250, 16000.
Mantis: 14010.
New Holland: B95B.
Temisko: 5 axel schnable tower transporter.
Terex: RT780.
Trail King: ED Series, TK70EFX blade transporter, 6 axel schnable
   tower transporter.
Vermeer: T655.