EquipmentImages net
Homewood Suites Hilton
![]()
Dennis Fehn Gravel and Excavating was contracted to remove and
replace the unstable soil at the site of the 125 room Homewood Suites
Hilton in Saint Louis Park, Minnesota.Equipment
![]()
Caterpillar: D8R, CP563C, 330Cl.
John Deere: 700Hlgp.
November 2008
![]()
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|